Jilin | COFCO Jiajiakang (Jilin) Co., Ltd. Cooperative Breeding Biogas Station Project
Construction Time: September, 2018;
Raw Materials: Pig Manure + Straw;
Daily Gas Production: 4000m³;
Biogas Use: Boiler Combustion, Anaerobic System Heating, and Biogas Station Heating in Winter.
Boiler combustion, anaerobic system heating, and biogas station heating in winter.
Details